The 6th Italian FREMM frigate, named Luigi Rizzo, was launched on the 19th of December at the FINCANTIERI integrated shipyard in Riva Trigoso.
The contract for a second batch of BOXER vehicles for Germany was signed on 18 December 2015 at the OCCAR-EA headquarters in Bonn by the original equipment manufacturer ARTEC GmbH and OCCAR.
A major milestone has been reached in the European MALE RPAS (Medium Altitude Long Endurance Remotely Piloted Aircraft System) effort: The approval of the Programme Management Authorisation (PMA) by the OCCAR Board of Supervisors
On 19 June 2015, the 300th BOXER vehicle was delivered by the manufacturer ARTEC to the Netherland’s Army.