The Critical Design Review (CDR) of the ESSOR OC1 HDRWF was achieved in Rome on 18 December 2019.
The OCCAR Director, Arturo Alfonso Meiriño and the a4ESSOR SaS president, Lino Lagana signed today, 2 November, in Bonn the contract for ESSOR Operational Capability 1.