MSN6 the final development aircraft for the A400M programme took to the skies for the first time today – 20th Dec.
For the Support of the TIGER Weapon System a major milestone was achieved with the signature of the Repair Frame Contract (RFC) with ECT.
Two Aster launches, carried out successfully from the Italian carrier Cavour on 18th and 19th May 2011, confirm the effectiveness of the System SAAM-IT,the anti-aircraft defence self protection system, developed within the FSAF systems family.
On the 20th December 2010, the fourth Airbus Military A400M military airlifter has made its first flight. Known as Grizzly 4, the aircraft took off from Seville, Spain with a weight of 130 tonnes at 10h18 local time (GMT+1) and landed five hours and ten minutes later.