OCCAR News 15. December 2021 COBRA Major Mid-Life Update (MLU) Contracts signed On 15/12/2021 the COBRA Team achieved a significant milestone... 21. September 2021 PPA3 First Sea Going On the first day of autumn, the third ship of the PPA Programme, named “Raimondo Montecuccoli”, sailed for the first time in the blue waters of the Tyrrhenian Sea... 25. September 2020 Additional MMF Aircraft Signature On 25 September, after six months of preparation, the OCCAR-EA Director, Matteo Bisceglia and Airbus Defence and Space representatives, Mr Didier Plantecoste and Mr Hervé Daumas signed MMF Contract Amendment 10 (CA-10). 31. December 2019 PPA Dual Band Radar X/C development The PPA Programme integrated the first two X-Band fixed sensor arrays (faces) of the new Dual Band Radar (DBR) X/C at the test bed in Pratica di Mare airfield in time for the Christmas festivities. Pagination Current page 1 Page 2 Page 3 Next page ›› Last page Last »